About your Search

20100901
20100930
Search Results 0 to 1 of about 2
and how hot it might have gotten after that. this morning it's about the rain for us. a warm sticky start but we have maryland's most powerful doppler radar and we have a flood watch across the area. no doubt about that with the heavy rain yesterday, one to three inches across the region, now frederick getting heavy rain but they are not alone. this line does weaken but it does break down through southeast virginia, that is just poised to pivot its way through. so we have wet weather for the morning commute to begin. there's that flood watch until 8:00 a.m. may get extended depending on how heavy this band of rain does hold once it swings through the beltway. plans for a wet commute, temperatures near 70. we break out sun and isolated storm this afternoon with our 2-degree guarantee high of 79. >>> lets check the roads with kim brown. >> we do not like the idea of a wet commute because we had such a bad one or difficult one yesterday. right now traffic looks pretty good, no problems on 795. that looks good the entire stretch between route 140 to the beltway. we are working one accident? m
about it. abc 2 news' sherrie johnson joins us live with more this morning. >> reporter: good morning, megan. that's right, some parents are fed up and they would like to see an addition built on here at hampton elementary school to get the students out of these trailers and into better classroom facilities here and to prevent that overcrowding. again, they say they thought construction was supposed to start but it hasn't. they are ready for that to begin. right now the elementary school is designed for 300 students. it opened last week with more than 500. the school has eight trailers outside. four on each side to help with the overcrowding. hampton's pta president said every fourth and fifth grader will be in a trailer. and parents say they are happy with their old building, they just want it to be bigger. county officials say countywide referendum is needed before funding for the addition can be approved. >> there's no construction starting because we didn't get the funding. parents were shocked. >> with an overcapacity in the towson area of well over 300 students, bcps and county
Search Results 0 to 1 of about 2

Terms of Use (10 Mar 2001)